One site draws the tube, welds the standard, galvanises the batch and packs the container. Nothing is subcontracted to a second yard.
300,000Scaffolding fabrication. First certified 02 Aug 2024, this certificate issued 22 Jul 2026, valid to 01 Aug 2027.
Scaffolding manufacturing and environmental management activities. Same cycle: certified 2024, reissued 22 Jul 2026, valid to 01 Aug 2027.
Scaffolding manufacturing and occupational health and safety management activities. Valid to 01 Aug 2027.
Issued by Zhongbeifang Certificate Service (Beijing) Co., Ltd. — CNAS C375-M, IAF MLA. Surveillance audit of 22 Jul 2026 found all three systems maintained. Surveillance notice (PDF). Every number above can be checked with the issuer.
The node
Bridge decks, industrial shoring, refinery staging. Ø60.3 standards and heavier walls carry the load — same node geometry, so a crew already running 48 series needs no new tools.
| Component | Series | Typical length | Tube | Steel |
|---|---|---|---|---|
| Standard | 48 | 1000 – 3000 mm | Ø48.3 × 3.2 | Q355B |
| Standard | 60 | 1000 – 3000 mm | Ø60.3 × 3.2 | Q355B |
| Ledger | 48 / 60 | 300 – 2400 mm | Ø48.3 × 3.2 | Q355B |
| Diagonal brace | 48 / 60 | 1500 × 2000 mm | Ø48.3 × 2.5 | Q235B |
| Steel plank | — | 1500 – 2400 mm | 1.8 mm deck | S235 |
Typical range for selection. Final lengths, wall thickness and galvanising class are fixed against the order drawing. Custom lengths and OEM marking from 1,000 pieces.
Ten parts make a lift. Every one of them is drawn, welded and galvanised on the same site — no second supplier in the chain. All ringlock parts are declared against EN 12810-1 / EN 12811-1.










Photographs are of EAND parts. Dimensions and wall thickness are fixed against the order drawing, not against this page.
Project references
Overseas references are released under NDA. We do not borrow another factory's site photographs.